We took responsibility for the design and installation of the project from consultancy to full project delivery completing on time and on budget.
img_gallery_12
Xsem included making a dedicated space for the marketing team that was on trend with modern coffee shop vibe incorporating smart working spaces.
img_gallery_17
Our client tendered this project through CBRE and we were successful in developing the concept design to a full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.
픽스업
Building Interiors complied with all idea boilers rigorous health and safety requirements. Through partnering with their on-site team we successfully completed all designs and installations as required.
img_gallery_19
Mechanical and Electrical works, Supplied and fitted all storage and furniture, Solid and glass partitions and folding dividing walls, Ceilings and flooring, Decoration, and Refreshment area
banner_900_900_23
공항 전체에 태양열 집열판을 활용해 전력을 공급함으로써 대형 공항으로서는 높은 수준의 에너지 효율을 자랑하는 친환경 건물로도 명성이 높습니다. 비행기의 이착륙이 늘어나는 초저녁 무렵이 되면 덴버국제공항의 아름다움은 극대화됩니다. 그렇게 덴버국제공항은 등장과 동시에 덴버를 상징하는 랜드마크로 단숨에 자리매김했습니다.
banner_900_900_34
Full refurbishment of reception, atrium and washrooms including; Strip-out, mechanical & electrical alterations, exposed ceilings, feature lighting, flooring, decoration, bespoke joinery items, furniture and signage.
img_gallery_6
Refurbishment of ground floor and first floor offices including changes to the reception area. An industrial theme was adopted in places which including stripping out a suspended ceiling and utilising natural products where possible.